• 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
Business Field
Domestic Engineering
Overseas Engineering
EPC Engineering
首页>> ENGLISH>>Business Field>>Overseas Engineering
Sewer System Household Connection Project in Malabo, Equatorial Guinea
Date:2016-11-14 Font-size:[ Big Middle Little ]

The Sewer System Household Connection Project is the Phase II projectof Urban Sewer System and Sewage Treatment System Project inMalabo, Equatorial Guinea. Our company undertakes the tasks of survey,design and technical service within the scope of the project contract,including feasibility study report, technical proposal, shop drawing designand so on. The project content covers the pipes from the public andresidential buildings to the urban sewer system, as well as the sewermanholes. The construction of the project will solve the random sewagedischarge problem of the whole city residents, enable the new sewagetreatment plant to play its role effectively, and improve the environmentalappearance of the city.The work quantity of the contract totally includes sewer pipes of 177.22kmand sewer manholes of 10,785 sets. The project started design in August2012 and construction in May 2013. Up to date, 70% of the constructionwork has been completed. The project is expected to be completed and put into operation in May 2016.