Construction scale: short-term (2013-2015) heating area 12.3 million, heating load 633.71MW, heating pipeline 2*84.997km, main pipe diameter DN1400, new heating station 57 sets.
Long-term total heating area 36.8 million m2, total heating load 2810.77MW, heating pipeline totally 2*119.028km, heating stations totally 106 sets.
Investment: approximately CNY1.06 billion
|