Ghana Kpong Water Supply Expansion Project includes water intake,intake pumping station, raw water pipeline (DN1200, 2.7km), watertreatment plant, water transmission pipeline (DN1200, DN900, totally73.5km), Dodowa midway booster pumping station, Oyibi elevatedreservoir (40000m3), Boi water supply pumping station and reservoir,urban water distribution pipe network (DN200-DN600, totally 63km),33KV external power line (39km), Accra guesthouse, rehabilitation ofhead office building in Accra, reinforcement of MPZterminal reservoir,construction and maintenance of staff dormitory building etc. Of which,the water intake is constructed on long-term scale of 353,000 m3/d, andthe water treatment plant is constructed on the scale of 186,000 m3/d.The survey, investigation and design tasks of the project are undertakenby our company.The design was started in January 2010 and construction in June 2011.On December 23, 2014, Ghanaian President John Mahama pushedthe start button in person, and announced that Kpong Water SupplyExpansion Project was put into use by half a year ahead of schedule。

|