Bali Lake Bridge in Jiujiang City
Date:2016-11-13 Font-size:[ Big Middle Little ]

 

 

 

80.55+2*132+80.55m three-pylon double-cable-plane stayed main bridge, ring-look cable tower, variable cross-section reinforced concrete structure ; uniform cross section girder; sectoral arranged stay cables.

Construction scale: 1.836km, total bridge length 1.59km, bridge standard cross section width 32m