• 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
Domestic Engineering
Water Supply project
Drainage Work
Architectural Engineering
Highway And Road project
Fuel Gas project
Bridge and Tunnel project
Landscape Architecture
Public Transportation And Underground Space
Heat Supply Project
Environmental Project
首页>> ENGLISH>>Business Field>>Domestic Engineering>>Water Supply project
Lanzhou New Area Water Supply Project - 2nd Water Supply Plant (Shimengou Water Plant) Project
Date:2016-11-13 Font-size:[ Big Middle Little ]

Different quality water supply system for urban and industrial use, process: grid (folded plate) flocculation, horizontal-flow + inclined plate (tube) composite sedimentation tank. In condition of low temperature and low turbidity, the factor of high-turbidity in raining season is considered as well. The treated water quality conforms to the national domestic and drinking water quality standard GB5749-2006.

Construction scale: 60,000+140,000m3/d, of which 150,000 m3/d for urban use, 50,000 m3/d for industrial use

Investment: CNY420 million